User Tools

Site Tools


cv1

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
cv1 [2021/01/24 17:17]
phatline [Building]
cv1 [2021/03/10 13:34] (current)
phatline
Line 3: Line 3:
 Control Voltage Recorder, Looper, and Generator - for a own Eurorack-Line... more in Future!\\ Control Voltage Recorder, Looper, and Generator - for a own Eurorack-Line... more in Future!\\
 {{:​phatline:​CV1-Case-Proto0.jpeg?​500|}}\\ {{:​phatline:​CV1-Case-Proto0.jpeg?​500|}}\\
---this picture is the first prototype - pre-Eurorack :-D +--this picture is the first prototype - pre-Eurorack :-D\\ 
-[[https://​youtu.be/​pwgeu4ws50o|very-early-version...k]]+[[https://​youtu.be/​pwgeu4ws50o|very-early-version...k]]\\ 
 ===== Features ===== ===== Features =====
  * A Envelope which can be Recored from an AIN-Source, it can be Editet on Startpoint,​ATK-Playbackrate,​ Decay-Playbackrate\\  * A Envelope which can be Recored from an AIN-Source, it can be Editet on Startpoint,​ATK-Playbackrate,​ Decay-Playbackrate\\
Line 12: Line 13:
  * Copy, Paste, Clear: to Transfair the CV Sequence to other CV1 Instances\\  * Copy, Paste, Clear: to Transfair the CV Sequence to other CV1 Instances\\
  * ProgramChange Load and Store on microSD-Card,​ Load and Store are CC-Commands,​ so you can remote the device\\  * ProgramChange Load and Store on microSD-Card,​ Load and Store are CC-Commands,​ so you can remote the device\\
- * The Sequencer can be set to Tact Systems: 3/4 4/4 5/4 7/4 9/4 11/4 13/4 + * The Sequencer can be set to Tact Systems: 3/4 4/4 5/4 7/4 9/4 11/4 13/4\\ 
 + 
 +{{:​phatline:​CV1-Proto-Front.jpg?​700|}}\\ 
 +--First Prototyp with a fiew modifications\\ 
 + 
  
 ====== Hardware Requirements ====== ====== Hardware Requirements ======
cv1.1611508634.txt.gz · Last modified: 2021/01/24 17:17 by phatline